Construction & Construction Management


Showing 7 from 57 Items
  • Item thumbnail
    0

    Tunnel Dewatering Pump Station

    MWH is providing preliminary and final design service for the Tunnel Dewatering Pump Station (TDPS) project, one of the largest combined sewer pump station projects in the U.S. This critical component is the second scheduled as part of the $3 billion CSO Plan Improvements Program for the Northeast Ohio Regional Sewer District (NEORSD). This project […]

  • Item thumbnail
    0

    Wainikasou Hydroelectric Power Scheme

    Award-Winning Energy Solution for Fiji MWH provided detailed design, equipment procurement, construction supervision and commissioning services for the 6.5 MW Wainikasou Hydroelectric Power Scheme, Fiji’s first renewable energy development in 25 years.

  • Item thumbnail
    0

    Wanlip Sewage Treatment Works

    Wanlip STW is a 900,000 PE works serving Leicester. Under AMP4 Severn Trent are making significant Investments in the improvement of Wanlip Sewage Treatment Works. The planned work is phased over several stages between 2005 and 2010. Starting with a Capital Maintenance Works Severn Trent plan to improve and expanded the Wanlip site.

  • Item thumbnail
    0

    Watchgate

    Improvement works to an existing water treatment works located at Kendal in the Lake District to protect against cryptosporidium and provide sludge treatment facilities. The 620 MLD works is United Utilities largest plant supplying 35% of customers (1.5m population).  

  • Item thumbnail
    0

    Water Pretreatment Facility for Wastewater Plant - The Dannon Co.

    Using an accelerated design-build approach, MWH was able to develop a new multi-million dollar wastewater pretreatment system in West Jordan, Utah, allowing the Dannon Company to begin using its new facility after just six months of design and construction. In spite of a series of challenges, including permitting, weather constraints and environment challenges, the new […]

  • Item thumbnail
    0

    Water Supply, Sanitation and Drainage Project

    In Zambia, the average walking distance from a home to a source of water is estimated to be 1 to 3 kilometers – a 30 minute walk. Clean water available for drinking and other domestic uses is well below the amount required for a healthy, disease-free environment. Poor water supply and sanitation services in peri-urban […]

  • Item thumbnail
    0

    Water Treatment Plant No. 4 (WTP4)

    Construction plans for the plant include a marine raw water intake, tunnels, pump stations, conveyance systems and water treatment facilities with an initial 50-mgd capacity, expandable to 300 mgd. The new plant will take raw water from Lake Travis and connect to a pump station via a 9-ft finished diameter tunnel. The raw water pump […]