Energy & Power

You are here: Home  > All Projects  > Markets  > Energy & Power

Showing 10 from 59 Items
  • Item thumbnail
    0

    Consulting Services for the Energy Efficiency (CS04)

    In Turkey, an energy-intensive country, it is important to promote the energy efficiency market and support commercial lending for energy efficiency. The aim of the project is to develop an ESCO industry in order to support Turkey’s achievement of energy efficiency targets, to introduce regulations to help develop, finance and implement energy efficiency projects, and […]

  • Item thumbnail
    0

    Dunedin International Airport

    When Dunedin International Airport Ltd decided to upgrade and extend its terminal facilities, MWH was commissioned to deliver designs for the mechanical and HVAC services. Addressing the complex demands of highly variable occupancy, the challenging environment (the outdoor temperature varies from -9°C to 35°C) and ambitious energy efficiency goals for the 10,000m² terminal, required an […]

  • Item thumbnail
    0

    Egypt Sustainable Energy Financing Facility (EgyptSEFF)

    EgyptSEFF is a USD 30 million credit line dedicated to finance energy efficiency and renewable energy investments in Egypt. The credit line is developed by EBRD, and is availed to clients in Egypt through the NBE. The two year project is a pilot test for larger financing facilities dedicated to sustainable energy in Egypt and […]

  • Item thumbnail
    0

    Egypt Sustainable Energy Financing Facility Phase II (EgyptSEFF II)

    The purpose of EgyptSEFF II is support the implementation of the Facility, resulting in a pipeline and portfolio of eligible Sub-projects. This requires demonstration of Sub-project performance and the transfer of skills to local experts and PFIs so that such Sub-projects may be replicated.  

  • Item thumbnail
    0

    Energy management based on NEN-ISO 50001

    MWH helped the Dutch Standards Institute NEN organise a two-day course on the new standard in association with MWH to inform participants of the key aspects of ISO 50001 and how to apply the standard in practice.The then new standard ISO 50001 sets out the requirements an energy management system must meet. The new standard […]

  • Item thumbnail
    0

    Energy Scans for Provincial Water Supply Co.

    To help reduce CO2 emissions, PWN has prioritised the Trias Energetica as follows: Reduce energy consumption and prevent greenhouse gas emissions Use sustainable sources of energy Compensate The first step – reducing energy consumption – was taken by performing energy scans. These energy scans provide insight into the current levels of energy consumption at the […]

  • Item thumbnail
    0

    Estí Hydroelectric Project

    Meeting Panama’s Growing New for Power MWH was the Owner’s Engineer for the 120 MW Estí Hydroelectric Project, part of a program to meet Panama’s growing need for electricity. Completed in 2003 and located 400 kilometers west of Panama City, the project uses outflows from the existing Chiriquí and Fortuna hydroelectric projects, intervening inflows of the […]

  • Item thumbnail
    0

    External Resettlement & Social Monitoring of Hebei Rural Renewable Energy Development Project

    The Hebei Rural Renewable Energy Development Project is a project financed by the World Bank for the development and ongoing management of large-scale biogas projects in rural areas in the Chinese province of Hebei, and providing technical support, project management and monitoring, including technical services, training and promotion, and evaluation. The objective of the project […]