    2018 Commonwealth Games Transit Malls

    Client: Department of Transport and Main Roads (TMR) TMR completed an initial investigation of Transit Malls for the Commonwealth Game. Transit Malls are significant public transport stations or interchanges that are integrated with the surrounding streets. For the Commonwealth Games, these Transit Malls will support the movement of the Games Family, athletes, spectators, journalists and broadcasters with bus services. […]

  • Item thumbnail
    0

    Abberton Reservoir Scheme

    To meet water resource requirements in the future, Essex & Suffolk Water implemented a scheme to increase the storage capacity at their existing reservoir at Abberton, from 26 to 41 billion liters of water. The scheme was designed to minimise impact on the environment and improve amenity and ecological habitats.

  • Item thumbnail
    0

    African Climate Technology Finance Center and Network Mitigation Framework Agreement

    The general objective of the assignment is to support the enabling and the scaling-up of technology transfer through policy, institutional and organizational reforms. It will seek to enhance the enabling environment for climate change technology transfer, which is one of the main constraints in Sub-Saharan African (SSA) countries.

  • Item thumbnail
    0

    Air Quality Governance (AIR-Q-GOV) in the ENPI East countries

    The project is one of a series of regional governance projects launched by the European Commission to support the partner countries in ENPI East to increase their convergence to the EU standards in the environmental sector. The overall objective of the project is to enable an improved and sustainable management of natural resources including nature […]

  • Item thumbnail
    0

    Albany Park Stormwater Diversion Tunnel

    Construction will begin for a stormwater diversion tunnel that MWH was retained to design in order to alleviate the chronic, damaging flooding in the Albany Park neighborhood in the City of Chicago.

  • Item thumbnail
    0

    Alewife Reservation Stormwater Wetland

    Since 1998, MWH has been engaged by the Cambridge Department of Public Works to engineer a sewer separation project in Massachusetts. The sewer separation project lies within the Alewife Brook watershed, features an engineered storm water wetland. The wetland was completed in October 2013 as part of $117 million in ongoing construction that will reduce […]

  • Item thumbnail
    0

    AMP Hydropower Projects - Cannelton, Smithland, Willow Island, Meldahl

    MWH Global is engineering the largest deployment of clean, renewable run-of-river hydroelectric generation in the U.S. MWH Global was selected by AMP in 2007 to serve as Owner’s Engineer for the design and construction management of four new hydroelectric projects at existing Federal dams on the Ohio River. MWH is concurrently providing resident engineering during the […]

  • Item thumbnail
    0

    Anaheim Water Recycling Demonstration Facility

    The City of Anaheim selected MWH to plan and design a new water recycling facility to demonstrate how urban developers can utilize low impact development features in any location. The Water Recycling Demonstration Facility (WRDF), which consists of a Membrane Bioreactor (MBR), ozonation and UV disinfection, illustrates how six separate water sustainable features are used […]

  • Item thumbnail
    0

    Anaheim Water Recycling Demonstration Project

    The City selected MWH, now part of Stantec, to design the Water Recycling Demonstration Facility (WRDF), which will consist of a membrane bioreactor system, ozonation and UV disinfection. The WRDF was built in two phases with an ultimate treatment capacity of 100,000 gpd. Phase 1 of the project consisted of designing and building a 50,000 […]