United States

You are here: Home  > Locations  > Americas  > United States

Showing 10 from 68 Items
  • Item thumbnail
    0

    Albany Park Stormwater Diversion Tunnel

    Construction will begin for a stormwater diversion tunnel that MWH was retained to design in order to alleviate the chronic, damaging flooding in the Albany Park neighborhood in the City of Chicago.

  • Item thumbnail
    0

    Alewife Reservation Stormwater Wetland

    Since 1998, MWH has been engaged by the Cambridge Department of Public Works to engineer a sewer separation project in Massachusetts. The sewer separation project lies within the Alewife Brook watershed, features an engineered storm water wetland. The wetland was completed in October 2013 as part of $117 million in ongoing construction that will reduce […]

  • Item thumbnail
    0

    AMP Hydropower Projects - Cannelton, Smithland, Willow Island, Meldahl

    MWH Global is engineering the largest deployment of clean, renewable run-of-river hydroelectric generation in the U.S. MWH Global was selected by AMP in 2007 to serve as Owner’s Engineer for the design and construction management of four new hydroelectric projects at existing Federal dams on the Ohio River. MWH is concurrently providing resident engineering during the […]

  • Item thumbnail
    0

    Anaheim Water Recycling Demonstration Facility

    The City of Anaheim selected MWH to plan and design a new water recycling facility to demonstrate how urban developers can utilize low impact development features in any location. The Water Recycling Demonstration Facility (WRDF), which consists of a Membrane Bioreactor (MBR), ozonation and UV disinfection, illustrates how six separate water sustainable features are used […]

  • Item thumbnail
    0

    Anaheim Water Recycling Demonstration Project

    The City selected MWH, now part of Stantec, to design the Water Recycling Demonstration Facility (WRDF), which will consist of a membrane bioreactor system, ozonation and UV disinfection. The WRDF was built in two phases with an ultimate treatment capacity of 100,000 gpd. Phase 1 of the project consisted of designing and building a 50,000 […]

  • Item thumbnail
    0

    Aurora Prairie Waters Project

    MWH was responsible for planning, preliminary design, final design and services during construction, PLC programming, startup and commissioning and warranty support for the $160 million, 50 mgd raw water conveyance system as part of the Aurora Prairie Waters project. The conveyance system includes 34 miles of raw water conveyance piping with a diameter of 60 […]

  • Item thumbnail
    0

    Blue Buttes Special Waste Landfill

    The project involved conducting site characterization investigation which included completing geological and hydrogeological investigation and testing to determine suitability for landfill siting in compliance with North Dakota regulations.

  • Item thumbnail
    0

    Brightwater Wastewater Conveyance

    In response to rapid population growth in King and Snohomish counties, a new regional wastewater treatment plant was designed to treat an average of 36 million gallons of wastewater a day, impacting nearly 190,000 people. King County selected a joint venture including MWH to provide final design services for the conveyance portion of the new […]

  • Item thumbnail
    0

    Camrosa Water Reclamation Facility Disinfection Study

    The Camrosa Water Reclamation Facility (CWRF) provides recycled water for crop irrigation but was limited in the volume of water it could produce because the chlorine contact basins, which pre-dated the rest of the treatment facility, were not large enough to meet the default regulatory minimum contact times (CT). MWH, now part of Stantec, developed […]

  • Item thumbnail
    0

    Central Valley Flood Management Planning Program

    MWH successfully led the on-time completion of the first-ever, State of California Central Valley Flood Protection Plan (CVFPP). Adopted June 29, 2012, by a unanimous vote of the state’s Central Valley Flood Protection Board (Board), the 2012 CVFPP provides a comprehensive plan to modernize a flood management system that protects more than one million people […]